Project name

Trabzon Bus Station

Location

Trabzon, Turkey

Customer

BEMO Turkey

Services provided:

  • Feasibility study for BEMO free-form membranes
  • Determining the quantity of input material
  • Creation of a release model based on the steel construction information
  • Static calculation of the substructure including fastening to steel construction purlins
  • Division of the substructure, as well as clash testing with steel construction
  • Preparation of assembly plans for the substructure and the standing seam membranes
  • Providing the production information for the curved substructure as well as the data for the free-form webs

Planned products:

  • BEMO N 65 MONRO ( 3.000 m² )
  • BEMO DOME substructure ( approx. 2,500 m )

Special challenge:

Attachment of the dome system directly to steel construction, thus only limited fastening options, strong segmentation of the steel construction, assembly planning together with progressive design planning, 4 construction phases with different installation directions

Facts & Figures

Programming period

05/2023-07/2023

Start of implementation + production data

2023

Completion of building envelope

2024

Number of installation plans

20

Static verifications

4

Parts Lists Material Complete

10

Construction site inspections

0